Leighton O'Brien's Pascal Perfect certification tests are the most convenient and sensitive precision test for new tanks, using a pressure transducer that is accurate to 1/7000 of a psi.

Across the thousands of new tank systems tested with Leighton O'Brien's Pascal Perfect certification tests, none have ever reported a leak. Used by oil majors around the world, This test is conducted in two stages; pre-bury testing, and post-bury certification test.

Our qualified technicians assess all connections, fittings and lines for leaks using the Pascal Perfect sensor, which is so responsive that even the most minute pressure changes are detected. Leighton O'Brien technicians consult with the installer to identify the locations of minor faults and leaks. Only when the Leighton O'Brien's Pascal Perfect certification tests confirms that all connections, fittings, lines and tanks are literally PERFECT will burial and concreting occur.

Stage One:
 
Stage Two:
Pre-bury Test –
before concrete
 
Post-bury Certification Test –
after concrete

The aim of pre-bury testing is to ensure a tight UST system before burial. This test takes place after all construction work on the tank field including running electrical conduit is completed.

Pascal Perfect pre-bury testing includes:

Tank ullages and wetted portion
Tank interstice(s)
Primary product lines
Secondary product lines
Vent lines
Secondary vent lines
(Stage II) Vapour recovery lines (where applicable)
Secondary stage II vapour recovery lines (where applicable)
 

The aim of certification testing is to ensure the UST system has not been disrupted during back fill and concreting and to meet the standard regulatory requirements.

Post-bury certification testing includes:

Tank ullages and wetted portion
Tank interstitial
Primary product lines
Secondary product lines
Vent lines
Secondary vent lines
(Stage II) Vapour recovery lines (where applicable)
Secondary stage II vapour recovery lines (where applicable)
Leak detector testing
ATG certification
Stage II pressure decay, dynamic back pressure and A/L testing (where applicable)

Leighton O'Brien
Delivers:


Perfectly tight storage systems

Convenient easy fix of accessible leaks while tank tops are exposed

Quick testing process that won't disrupt your construction schedule

Digital recording of all test data

Qualified and experienced technicians to consult with installer on your behalf

Easy identification and rectification of all leaks before you bury them

Best protection of your underground storage investment